LOCATION: Cuyahoga Heights, OH

PROJECT PARAMETERS:
 • Construction at the intersection of a residential street and a thoroughfare
• Connect existing sewer with interceptor
• 24/7 construction during road excavation
• 4 month project duration

9  auxilary shaft - text Progress Photos 031 Progress Photos 035

Related Projects