LOCATION: Cleveland, OH

PROJECT PARAMETERS:
• 350,000 sq. ft. renovation
• Historic Higbee Building
• 1st casino in State of Ohio
• Interior framing & drywall
• Acoustical ceiling tile package
• 5 month project duration

7167914524_a1b82afc6d_o 7167919984_48f4853d18_o 7167922534_b692c88e19_o 7177216430_051e83e7b9_o 7177217060_c7c2a924c8_o 7222685272_24b95a2917_o

 

Related Projects